Category
Power
-

Beyond the GPU: Siemens Targets the Power Behind AI
AI is putting new pressure on data centre power. Siemens is responding with 800VDC technology, solid-state transformers and new power infrastructure for high-density AI workloads.
-

Austin Hughes Targets Rack-Level Infrastructure Gap in AI Data Centres
Austin Hughes is positioning its rack-level power, cooling and monitoring systems for AI and cloud data centres as higher-density workloads increase operational complexity
-

AVK Moves Data Centre Power Towards Energy as a Service
Securing enough power is becoming a development problem rather than an engineering one AVK is responding by changing the commercial model around data-centre power. In September, the company launched AVK Capital, a dedicated funding arm that will finance and own on-site power infrastructure, allowing data centre customers to secure electricity through long-term Power Purchase Agreements…
-

Six Months, Not Fourteen: Schneider Electric’s Power Modules Tackle AI Bottlenecks
Schneider Electric launches standardised AI power Modules to cut deployment time to 6 months. Schneider Electric recently announced a new range of standardised Prefabricated Power Modules and Power Skids, aimed at hyperscale, neocloud and colocation data center operators building out AI infrastructure. The modules can deliver up to 2.5 megawatts of capacity each, which Schneider…
-

AI Data Center Power Design: Rewriting the Rules for the Modern UPS
The AI shock wave and why the UPS is becoming power’s new bottleneck For decades, the UPS had a simple, rather unglamorous job: sit quietly, clean up minor utility wrinkles, and keep the lights on just long enough for generators to kick in during a blackout, it was an insurance policy, nothing more. That era…
-

Google Bets on Nuclear Uprates
Rather than waiting years for new nuclear construction, Google is paying to squeeze more power out of reactors Georgia Power already operates — a novel tariff-based deal that adds 96 megawatts to the grid and could become a template for how AI companies secure firm, carbon-free power faster than new plants can be built.
-

Oracle Invokes Force Majeure on $165B Blue Owl Jupiter Data Center project
New Mexico AI Campus Hits Regulatory Wall Oracle Corp has sent a force majeure notice to Blue Owl Capital, the developer behind Project Jupiter, it’s 2.45-gigawatt data center campus under construction in New Mexico, according to Bloomberg, which cited people familiar with the matter. The move is designed to let Oracle delay lease payments, not…
-

Why Vertiv is Consolidating the AI Factory
The scaling bottleneck for artificial intelligence has officially left the chip lab and entered the physical world. Vertiv’s rapid string of acquisitions and high-capacity NVIDIA certifications reveal an industry-wide truth: the future of hyperscale compute belongs to those who control the physical mechanics of power and fluid
-

ABB Bets on Direct Current to Break the AI Power Wall
The AI power race is shifting from generation to the final hundred metres of the data centre. ABB’s new Infinitus direct current architecture aims to rewrite the white space by bypassing legacy alternating current infrastructure entirely to reclaim crucial compute capacity.
-

GridLock: Why Hyperscalers Are Buying Their Own Substations
While tech giants pour billions into advanced AI chips, their multi-gigawatt growth roadmaps are stalling at the local power grid. To survive the infrastructure crunch, cloud operators are transforming into heavy industrial procurement giants buying up transformer supply lines and building their own utility-scale substations.